Get in Touch with Aubrik Company
ABOKE TCO and ROI Calculator
Project the 5-factor total cost of ownership and payback period for an ABOKE shot blasting machine, against your current cleaning method. Industry-default ranges built in — adjust to your local rates for refinement.
Factor 1 — Production Volume
Factor 2 — Current Cleaning Method
Factor 3 — Labor and Energy
Factor 4 — Machine Investment
Factor 5 — Abrasive Consumption
Awaiting parameters.
Click “Project My Payback” to run the financial model.
Click “Project My Payback” to run the financial model.
Projected Payback
| Cost / Benefit Line | Annual ($) |
|---|---|
| Labor displacement | |
| Abrasive recycling / cost reduction (~15–30%) | |
| Downstream coating-rework savings (est) | |
| Energy cost | |
| Net annual benefit | |
| AB-SB-xxxx ballpark capital cost |
Inputs use conservative industry defaults. Real quotes vary with shipping, customization, certification level, and currency. Use this projection as a budgeting starting point — ABOKE commercial will return a written 5-factor breakdown within one business day on any application brief.
Request a Written TCO Breakdown →







