Get in Touch with Aubrik Company

Contact Form using

ABOKE Wind Tower Throughput Gain Calculator

Estimate your annual section output before and after ABOKE wind tower welding equipment automation. Benchmarks come from 16 documented project case studies.

Your Throughput Gain Estimate

Sections/month
after ABOKE
Output lift
Operators
after ABOKE
Headcount
reduction
Qualification rate
Qualification lift
Monthly labor cost
saving (USD)
Annual labor
saving (USD)

Estimate based on Xinjiang WT-WL-5000 reference: 80 staff → 25 staff (−69%), 320 → 550 towers/year (+72%). Your actual results scale with MW class, shift pattern, and SAW configuration. The honest framing — manual lines physically cannot hold 99.5% qualification on multi-pass thick-wall welds. Independent ROI studies show automated welding typically pays back in 1–3 years.

Send these numbers to ABOKE engineering for a custom analysis →