Get in Touch with ABOKE Company

Contact Form 使用中
[ FINANCIAL ANALYSIS ]

20-Year TCO Payback Calculator

Industry benchmark inputs (Summit Steel 2024 · MBMA via Construction Owners 2025). Compare ABOKE Steel Structure workshops against traditional concrete/brick over a 20-year service period.

Facility Baseline Inputs

20-Year Lifecycle Comparison

ABOKE Steel Structure

$350,000
  • Initial build cost:$185,000
  • 20-yr maintenance (1%):$37,000
  • 20-yr energy bill:$240,000
  • End-of-life salvage:-$92,500
  • Recyclability:90%+

Traditional Concrete

$870,000
  • Initial build cost:$525,000
  • 20-yr maintenance (3%):$315,000
  • 20-yr energy bill:$300,000
  • End-of-life salvage:$0
  • Recyclability:~30%

20-Year Net Savings with ABOKE Steel

$520,000

Payback Metric: Steel cheaper from day 1 (MBMA member benchmark)

Calculation Assumptions: Steel initial build estimated at $18.50/sqft (Tier Standard, 2025 EXW); Concrete estimated at $52.50/sqft. Maintenance ratios per Summit Steel 20-Year Comparison (Steel 1% vs Concrete 3% annually). Energy efficiency delta models a 20% reduction for insulated steel structures per Eurofer 2024 guidelines. Steel salvage value projected at 25% of initial material cost. Actual project parameters will vary; replace these assumptions in a Custom Comparison via the engineering team.